This apartment was a 4 month plan...it turned in to 9.
"Bring only the necessities"...we filled a whole lot of boxes with accumulated junk.
"No shoes in the apartment."..the carpet is a mess.
We out.
![]() |
| Source. I hovered the box over the color I wanted paint suggestions for... |
![]() |
| Source. Same easy process gave me some more great color suggestions. |
| Anemone Light: Blue Key Studios. |
| Wood paneling...still needs paint. |
| Faucet by Kohler. |
| Loving my new concrete counter top. Mike from Just Add Water did a fab job...more about him soon. |
| Kohler Faucet. I think I may attempt to tile the backsplash myself. |
| Marble surround went in and I'm LOVING it! Mantle being built and still needs to be installed. Thanks to Italia Granite and MGS By Design Fabricators for a fab job! |